Tuesday, July 21, 2026
Subscribe for News
  • Directory
  • Obituaries
  • About Us
  • Contact
  • Advertise
  • Become a Contributor
  • en English
    • en English
    • tl Filipino
    • fr French
    • hi Hindi
    • pa Punjabi
    • ta Tamil
    • ur Urdu
AllAboutDurham.com
  • Oshawa
  • Pickering
  • Clarington
  • Ajax
  • Whitby
  • Scugog
  • Brock
  • Uxbridge
  • Login
No Result
View All Result
  • TRANSPORTATION
  • CRIME
  • LIFESTYLE
  • SPORTS
  • POLITICS
  • EDUCATION
  • BUSINESS
  • ARTS & CULTURE
  • FOOD & DRINK
AllAboutDurham.com
Subscribe for News
epoxy
add a subheading 4
Home News

Simcoe Street Bridge Removal in Oshawa Hits Major Milestone

Maya by Maya
June 4, 2026
in News, Transportation
0
SIMCOE STREET BRIDGE REMOVAL UNDERWAY

SIMCOE STREET BRIDGE REMOVAL UNDERWAY

12
VIEWS
Share on FacebookShare on Twitter

Five months into a two-year closure of Oshawa’s Simcoe Street bridge, the project has reached its first major milestone as crews begin removing the century-old structure one beam at a time.

The full closure of Simcoe Street from Avenue Street to Albany Street, just south of Olive Avenue, began in January and is expected to take two years to complete as Metrolinx rebuilds the bridge over the CPKC rail tracks to support the planned new Central Oshawa GO station.

Related posts

Oshawa Hobby Shop Break-Ins: Police Seek Two Suspects

Oshawa Hobby Shop Break-Ins: Police Seek Two Suspects

July 21, 2026
Courtice Watermain Break Closes Sandringham Drive

Courtice Watermain Break Closes Sandringham Drive

July 21, 2026

This week’s work involved the careful removal of concrete beams across the tracks, a painstaking process that had to be paused each time a train passed through. Breaking down the walls on either side of the tracks and cutting and coring work are scheduled to continue through the rest of the week.

freeads
banner ads (14)

Bowmanville Construction Partners was awarded the contract for the first phase of construction, with work underway on key infrastructure upgrades including the replacement of the Simcoe Street bridge and the Farewell Street pedestrian bridge to support a new GO train track.

Watermain relocation on Albert Street has been completed, along with the construction of a chimney swift habitat at 500 Howard Street in Oshawa, both part of the broader project requirements.

The closure has been a source of frustration for Oshawa residents and businesses since it began. Regional councillors representing Oshawa had pressured Metrolinx late last year to minimize disruptions by keeping at least one lane open during construction. Metrolinx maintained that a full closure was necessary, telling council that a phased and partial closure of the century-old bridge was not safe or feasible.

The existing Simcoe Street bridge is more than 100 years old and nearing the end of its service life, according to Metrolinx. The new bridge will be higher, longer, and realigned to meet current engineering standards, designed to accommodate the expanded rail infrastructure needed for the Bowmanville GO extension.

The Simcoe Street bridge replacement is one of the most visible components of the larger Bowmanville GO rail extension project, which will bring GO train service east from Oshawa to Bowmanville for the first time. The project includes new stations at Thornton Road in Oshawa, Courtice in Clarington, and Bowmanville, along with significant track and infrastructure upgrades along the corridor.

While the two-year timeline has drawn criticism from the community, the current phase of bridge removal represents tangible progress. Once the existing structure is fully dismantled, crews will begin work on the foundations and supports for the new bridge, which will be built to accommodate both the existing CPKC tracks and the future GO rail infrastructure.

The bridge removal process is being carried out with precision and care, as crews work around active CPKC rail traffic that continues to operate beneath the structure. Each beam must be removed during brief windows between train movements, adding complexity to an already challenging engineering operation.

Local residents and commuters have had to adjust their routines significantly since the closure began in January, with traffic rerouted through residential neighbourhoods and travel times increased across the city’s south end.

Motorists are reminded that the full closure of Simcoe Street between Avenue Street and Albany Street remains in effect, with detour routes signed throughout the area. Pedestrian access across the tracks is maintained via the Farewell Street pedestrian bridge during construction.

Tags: Bowmanville GOBridge ConstructionGO TransitMetrolinxOshawaSimcoe Street Bridge
Maya

Maya

I am an Editorial Contributor at AllAboutDurham.com, working under the Managing Editor. I specialize in lifestyle and community-focused news and work to deliver well-researched, meaningful content that represents Durham’s diverse and growing community.

Related Posts

Oshawa Hobby Shop Break-Ins: Police Seek Two Suspects
Crime

Oshawa Hobby Shop Break-Ins: Police Seek Two Suspects

Durham Regional Police are asking the public to help identify two suspects after the same Oshawa hobby store was broken...

July 21, 2026
Courtice Watermain Break Closes Sandringham Drive
News

Courtice Watermain Break Closes Sandringham Drive

A watermain break has forced the emergency closure of part of Sandringham Drive in Courtice, disrupting traffic through a residential...

July 21, 2026
Pickering Casino Arrest Made in 2023 Guard Killing
Crime

Pickering Casino Arrest Made in 2023 Guard Killing

A man wanted in connection with the fatal shooting of a security guard at Pickering Casino Resort has been arrested...

July 21, 2026
Oshawa Clarington Break-Ins: Police Seek Suspects
Crime

Oshawa Clarington Break-Ins: Police Seek Suspects

Durham Regional Police are asking for the public’s help identifying at least three suspects linked to a series of commercial...

July 21, 2026
Oshawa Health Centre Sinkhole Closes Medical Building
Health

Oshawa Health Centre Sinkhole Closes Medical Building

An Oshawa medical building remains closed after a large section of its surface parking lot collapsed into an underground parking...

July 21, 2026
Oshawa GM Contract Talks Begin August 10 After Ford Deal
Business

Oshawa GM Contract Talks Begin August 10 After Ford Deal

General Motors workers in Oshawa will be watching closely when Unifor begins negotiations with the automaker on August 10, following...

July 21, 2026
Next Post
steve sheds 10,00 sheds built

Built Right Here in Oshawa: The Family Behind Steve Sheds

oshawa traffic

Oshawa Traffic Nightmare: Multiple Road Closures For Highway 401 Work Until 2027

arrest 2026

The Durham Police Roy Palmer Airborne Intercept and Arrest 2026: Arrest

chatgpt image may 22, 2026, 08 05 20 pm
20250516 2034 ski durham adventure simple compose 01jvcsya3he25r2qnkgz1jnaw3

FOLLOW US

BROWSE BY CATEGORIES

  • Arts & Culture
  • Business
  • Community
  • Crime
  • Education
  • Events
  • Food & Drink
  • Health
  • History
  • Lifestyle
  • News
  • Pets & Animals
  • Politics
  • Real Estate
  • Sports
  • Transportation
  • Uncategorized
  • Weather
chatgpt image may 21, 2026, 09 38 51 pm
20250516 0112 durham banner promotion simple compose 01jvaqf54pew68a8sk2w1jxzvy

POPULAR NEWS

  • temple

    Hidden Just Outside Durham, Ontario’s Wutai Shan Buddhist Garden Feels Like Another World

    0 shares
    Share 0 Tweet 0
  • Signs of Life Finally Appearing at Oshawa’s Future Central GO Station Site

    0 shares
    Share 0 Tweet 0
  • Highway 401’s Biggest Transformation in Decades Is Now Underway in Oshawa

    0 shares
    Share 0 Tweet 0
  • Rotary Park Nears Completion as Oshawa Prepares for a Summer of Free Family Fun

    0 shares
    Share 0 Tweet 0
  • Barack Obama to Headline 20th Anniversary Gala in Toronto This May

    0 shares
    Share 0 Tweet 0

Recent News

  • Whitby Wildfire Donations Accepted Through July 22
  • Oshawa Playground Program Returns to 16 City Parks
  • Oshawa GO Home Prices Rank Among Most Affordable
freeads
real dog training. real results. (5)
updated logo for aad

AllAboutDurham is a platform dedicated to sharing the latest news, updates, and insights about life in the Durham Region. It covers a wide range of topics including local events, community news, business highlights, real estate, and lifestyle stories offering residents and visitors a comprehensive view of what’s happening across Durham.

Category

  • Arts & Culture
  • Business
  • Community
  • Crime
  • Education
  • Events
  • Food & Drink
  • Health
  • History
  • Lifestyle
  • News
  • Pets & Animals
  • Politics
  • Real Estate
  • Sports
  • Transportation
  • Uncategorized
  • Weather

Recent News

Whitby Wildfire Donations Accepted Through July 22

Whitby Wildfire Donations Accepted Through July 22

July 21, 2026
Oshawa Playground Program Returns to 16 City Parks

Oshawa Playground Program Returns to 16 City Parks

July 21, 2026
  • About
  • Contact

© 2026 AllAboutDurham.com & Powered by Allaboutwebservices.com Inc.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Oshawa
  • Pickering
  • Clarington
  • Ajax
  • Whitby
  • Scugog
  • Brock
  • Uxbridge

© 2026 AllAboutDurham.com & Powered by Allaboutwebservices.com Inc.

Notifications