Skip to content
Advertisement
video unified 1200x150
banner ads 1

Durham Highway 401 Work Adds Later Ramp Restrictions

by All About Durham Editorial Team in News , Transportation
Conceptual editorial illustration of traffic cones separating lanes on a generic divided motorway at blue hour; not a map or photograph of Highway 401 work.
Original editorial illustration; not documentary photography.

Durham Highway 401 work will bring later overnight restrictions around Brock Road in Pickering and between Thickson Road and Brock Street in Whitby, according to seven current Ontario 511 entries checked November 26.

The records add new work periods to earlier notices. They distinguish partial lane restrictions from full ramp closures; none should be read as a shutdown of the entire highway through Durham.

Pickering: November 30 to December 5

Two alternating eastbound express lanes between Whites Road and Brock Road are listed for nightly construction from 9 p.m. November 30 through 7 a.m. December 5, record 347087.

Near Brock Road, two alternating westbound express lanes are listed for nightly construction from 8 p.m. November 30 through 5 a.m. December 5, record 347118. The provincial entry uses Brock Road as both location reference points.

All lanes of the eastbound on-ramp at Brock Road are listed closed nightly from 10 p.m. November 30 through 5:30 a.m. December 5, record 347106. A separate entry, 347111, gives the same period for a full closure of the eastbound collector off-ramp.

The westbound collector off-ramp at Brock Road has one alternating lane listed for nightly construction during that same 10 p.m.–5:30 a.m. overall window, record 347110. It is not described as an all-lanes ramp closure.

Separate collector and Whitby maintenance

Two left lanes of the westbound collectors at Brock Road are listed for nightly maintenance from midnight December 2 through 5 a.m. December 5, record 347128.

In Whitby, one left westbound lane between Thickson Road and Brock Street is listed for nightly maintenance from 11 p.m. November 29 through 5 a.m. December 4, record 347119.

These Durham Highway 401 work entries were updated November 26. Their nightly classification means the overall date range is not a continuous, multi-day closure. The new Brock Road dates differ from the earlier ramp period ending November 28, while the Whitby entry differs from the previously reported December 9 eastbound work.

The reviewed records do not specify confirmed signed detours. Check Ontario 511 before departure and follow posted controls; work plans and anticipated completion times can change.

Sources

Reported by

All About Durham Editorial Team

The All About Durham Editorial Team covers local news, events, public safety, weather and community updates across Durham Region, Ontario.

News from your community

Choose the Durham communities you want to hear about.

Choose your cities
Advertisement
20250516 0234 dynamic tutoring solutions simple compose 01jvaw5d64ear8wfqvygvh4v3k
Scroll to Top

ALL ABOUT DURHAM

News from your community

Choose your communities. Confirm your email. Stay connected.

Loading the signup form…

Unsubscribe at any time. Your subscription stays pending until you confirm your email.