Clarington Highway 401 work will add new nightly lane-restriction periods between Liberty Street and Highway 35/115 in early December, according to Ontario 511 records updated November 26.
The provincial roadwork service lists two alternating lanes affected in each direction. These entries do not describe a complete shutdown of Highway 401.
Westbound work begins December 1
The westbound entry covers the section from Highway 35/115 to Liberty Street. Its overall nightly construction period starts December 1 at 7 p.m. and has an anticipated end of December 5 at 7 a.m.
That is provincial record 347166, last updated November 26 at 3:44 p.m.
Eastbound work begins December 2
In the opposite direction, two alternating lanes between Liberty Street and Highway 35/115 are listed for nightly construction starting December 2 at 8 p.m., with an anticipated end of December 5 at 7 a.m.
The eastbound notice is record 347174, updated November 26 at 3:55 p.m.
These are additional December work windows, distinct from the previously reported westbound November 30–December 1 period and eastbound December 1–2 period on the same corridor.
Check current conditions before travelling
The nightly classification means recurring overnight work within the listed dates, not continuous restrictions around the clock for the entire multi-day period.
Drivers should check the live Ontario 511 service before departure and follow posted traffic controls. Anticipated completion dates can change; the reviewed entries do not provide a confirmed signed detour or a detailed description of the construction task.



