A Port Perry power outage is scheduled for Sunday, November 29, from 7 a.m. to noon while Hydro One performs maintenance affecting part of Elexicon Energy’s service area.
Elexicon’s current planned-outage listing identifies customers east of Simcoe Street and south of Queen Street as the affected group. It does not describe an interruption to every property in Port Perry.
The five-hour daytime outage is a planned maintenance interruption, rather than a report of storm damage or an unplanned failure. Daily Durham reported the notice Friday, November 20; Elexicon’s listing was checked against that account.
Customers can confirm whether their property is included and ask about the planned interruption through Elexicon’s outage-information line at 1-866-579-6819. The utility says it provides advance notices for planned work and aims to keep interruption periods as short as possible.
The Port Perry power outage has a different date and time from the overnight May 31–June 1 interruption previously reported by All About Durham. The November notice concerns work beginning at 7 a.m. and ending at noon on November 29.
Residents should consult the utility’s live listing for any subsequent schedule changes. No additional affected streets, customer total or equipment replacement details are specified in the cited Port Perry entry.
Featured image: original conceptual editorial illustration, not documentary photography.



