Oshawa and Clarington highway work will affect an eastbound stretch of Highway 401 and the northbound Highway 418 on-ramp this week, according to two Ontario 511 entries updated November 17.
On Highway 401 eastbound, two alternating lanes are scheduled to be affected between Harmony Road in Oshawa and Courtice Road in Courtice. The nightly construction period begins at 9 p.m. Thursday, November 19, and runs through 6 a.m. Saturday, November 21.
That is Ontario 511 record 252240, last updated at 10:18 a.m. on November 17. It describes recurring night work rather than a continuous closure of the entire highway.
In Clarington, daily maintenance affects the Highway 418 northbound on-ramp at Highway 401. The entry lists one alternating lane from 8 a.m. Wednesday, November 18, through 4 p.m. Friday, November 20.
The ramp work is record 252226, updated at 10:01 a.m. on November 17. The listing does not describe a full ramp closure or provide a signed detour route.
These entries add different work periods to the Ritson–Harmony lane restrictions and other later-November projects already reported by All About Durham. A fresh roundup alone does not make unchanged older work a new announcement; this report is limited to the two newly verified records.
Drivers should allow for lane changes and follow posted traffic controls. The provincial roadwork list can change as schedules, weather and operational conditions change. Consult the live Ontario 511 entry before travelling rather than treating the published window as a guarantee of current lane availability.



