Lakeshore East trains will not run on November 28 and 29 as planned construction replaces rail trips with GO buses, affecting riders in Pickering, Ajax, Whitby and Oshawa.
GO Transit’s official construction notice confirms the weekend shutdown and sets out several replacement-bus patterns. Passengers should choose a route serving their station rather than assume every bus stops everywhere.
Three bus patterns for Durham stations
From Union Station Bus Terminal, route 90W will travel directly to Whitby GO and then Durham College Oshawa GO. Route 90R will run directly to Pickering GO before continuing to Ajax GO. Route 90B will reach Pickering GO and then make all stops to Durham College Oshawa GO.
For westbound trips, the patterns reverse: 90W serves Oshawa and Whitby before travelling directly to Union, 90R serves Ajax and Pickering before Union, and 90B makes stops from Oshawa to Pickering before the direct Toronto leg.
There will be no GO Transit service at Rouge Hill, Guildwood, Eglinton, Scarborough or Danforth GO during the shutdown. GO lists TTC alternatives for those stations and advises passengers to check TTC service adjustments as well.
Late-Friday changes begin the disruption
On Friday, November 27, the 11:09 p.m. train from Durham College Oshawa GO is scheduled to depart seven minutes earlier, at 11:02 p.m. The 11:39 p.m. train will not run; a replacement bus will stop through Pickering before continuing directly to Union Station Bus Terminal.
GO also says the 11:22 p.m. Union departure will leave 18 minutes earlier and terminate at Whitby. The 11:50 p.m., 12:20 a.m. and 12:50 a.m. Union departures will not operate, with buses provided from Union Station Bus Terminal to Pickering and onward to Oshawa.
The changes to Lakeshore East trains are distinct from the hourly rail schedule announced for November 21. Riders should not apply the earlier weekend’s arrangements to November 28–29.
Passengers connecting with Durham Region Transit should check local schedules and allow for the bus-based journey. The construction notice says the work supports infrastructure renewal and more frequent future rail service; it does not give a single travel-time estimate for every replacement trip.



