Skip to stories
Durham Region, Ontario

Local News

Overnight Rail Milling Works Coming to Lakeshore East Corridor in Durham

Metrolinx will carry out overnight rail milling work along the Lakeshore East corridor from Pickering GO to Oshawa GO, starting November 20, 2026 and running to January 31, 2027, with no traffic disruptions expected.

Illustration: railway tracks at night under a moonlit sky, with work cones beside the track, captioned Overnight rail milling works — Lakeshore East corridor, Pickering to Oshawa, Nov 20, 2026 – Jan 31, 2027.
Original editorial illustration created for AllAboutDurham; not a photograph of a real place, person, or event.

Metrolinx will carry out overnight rail milling work along the Lakeshore East rail corridor in Durham Region, starting Friday, November 20, 2026, and continuing through January 31, 2027.

Crews will use a specialized rail milling machine for state-of-good-repair rail maintenance. The work will progress east from Pickering GO to Oshawa GO in stages along the corridor. Most of the work will take place overnight, between 11:00 p.m. and 6:00 a.m., Monday to Sunday, when trains are not in service, and during planned major track closures on the Lakeshore East line. Work will be continuous throughout those closures.

No disruptions to traffic are anticipated, and all pedestrian sidewalks will remain open throughout the work. Residents and businesses near the corridor may experience noise and vibration from the construction equipment; Metrolinx says crews will take measures to minimize disruptions wherever possible. Truck activity will be limited and will mainly occur overnight or during the planned closures, using existing rail access points to remove residue from the work area. Work may be delayed or rescheduled due to weather or unforeseen circumstances.

For GO Transit service changes, riders should check GOTransit.com. Questions about the work can be directed to Metrolinx at durhamregion@metrolinx.com or 416-202-3900.

Source: Metrolinx, Lakeshore East Rail Corridor Milling Works in Durham Region, November 19, 2026.

Illustration created for AllAboutDurham; not a photograph of a real place, person, or event.

Source: Metrolinx Lakeshore East GO Expansion

Featured image: illustration, not documentary photography. Original editorial illustration created for AllAboutDurham; not a photograph of a real place, person, or event.

Source report

Save to list

ALL ABOUT DURHAM

News from your community

Choose your communities. Confirm your email. Stay connected.

Loading the signup form…

Unsubscribe at any time. Your subscription stays pending until you confirm your email.