Skip to content
Advertisement
homepage unified 1200x150
add a subheading 7

Pickering Express Closures Add November 30 Work Windows

by All About Durham Editorial Team in News , Transportation
Original conceptual editorial illustration of parallel highway carriageways and construction barriers at night; not an actual work site.
Original editorial illustration; not documentary photography.

Pickering express closures on Highway 401 are listed in two newly observed Ontario 511 entries covering work periods that start November 30.

One concerns the eastbound express roadway between Whites Road and Brock Road. The other covers westbound express lanes from Whites Road in Pickering to Port Union Road in Toronto, including two transfer points.

Eastbound express maintenance

Record 347483 lists all eastbound express lanes between Whites and Brock roads as closed for nightly maintenance. Its overall window begins at midnight November 30 and ends at 5 a.m. December 5.

That full express-roadway entry is different from the previously reported two-alternating-lane construction restriction on the same eastbound stretch. Both records should be checked before a trip; the new entry must not be simplified into a claim that every express and collector lane is closed.

Westbound work reaches Toronto boundary

Record 347506 lists all westbound express lanes between Whites Road and Port Union Road as closed for nightly construction from 10:30 p.m. November 30 through 5:30 a.m. December 2.

The detailed notice also closes the collector-to-express transfer at Rougemount Drive and the express-to-collector transfer at Sheppard Avenue/Port Union Road.

This is not the same roadway or work period as the previously reported westbound collector closure from Brock Road to Port Union Road on November 29–30. Express and collector restrictions should not be treated as interchangeable.

Work windows are nightly

Both new entries describe nightly activity, not an uninterrupted shutdown throughout the full multi-day date range. The notices do not establish a single guaranteed detour for every affected ramp or transfer.

The eastbound record retains a November 26, 9:35 a.m. update timestamp, and the westbound entry a November 23, 10:15 a.m. timestamp. Both appeared in the November 27 noon roadwork data after being absent from the complete morning snapshot; they are newly identified schedules, not necessarily newly announced work.

Drivers planning around the Pickering express closures should consult the current Ontario 511 records before departure and follow posted controls. Construction schedules can change.

Sources

Featured image: original conceptual editorial illustration, not documentary photography.

Reported by

All About Durham Editorial Team

The All About Durham Editorial Team covers local news, events, public safety, weather and community updates across Durham Region, Ontario.

News from your community

Choose the Durham communities you want to hear about.

Choose your cities
Advertisement
ad1
Scroll to Top

ALL ABOUT DURHAM

News from your community

Choose your communities. Confirm your email. Stay connected.

Loading the signup form…

Unsubscribe at any time. Your subscription stays pending until you confirm your email.