A Fair Bridge closure is being prepared in Sunderland after engineering assessments found structural concerns, while Purvis Bridge in Cannington is being restricted to one lane, the Township of Brock says.
The township’s November 24 notice identifies Fair Bridge as the crossing on Brock Concession 5 east of Highway 12. It says the crossing will close once the necessary signs are in place. The notice does not give a precise start time or a reopening date.
Purvis Bridge is on Brock Concession 11 between Sideroad 18A and Sideroad 18. The township says traffic there will be limited to a single lane, with staff arranging traffic-control measures.
Testing identified structural concerns
A qualified engineering consultant carried out structural testing and inspections for the township. The results identified issues requiring immediate attention for public safety, including deficiencies in several aging timber supports at Fair Bridge.
Mayor Jubb said council had approved funding in the 2026 budget for extensive evaluation of both crossings. The township describes the testing as part of its work to identify infrastructure problems and plan repairs.
Engineers are exploring solutions for Fair Bridge and evaluating options for Purvis Bridge. Those assessments should not be read as a confirmed repair contract, construction schedule or commitment to reopen on a particular date; none is supplied in the notice.
Check the township’s detour information
The official announcement includes a detour map and says further project and bridge-status updates will be shared when more information is available. Travellers should consult that notice and follow the signs at the crossings rather than assume the two locations have the same restriction.
The Fair Bridge closure and the Purvis single-lane restriction are separate measures affecting different concession roads. Neither notice announces a township-wide road closure.



