Durham highway restrictions will add new lane, roadway and maintenance windows in Oshawa, Whitby, Ajax, Clarington and Port Perry, according to Ontario 511’s current roadwork records.
The seven entries below were updated November 17 or 18. They are additional work periods, distinct from the earlier November lane restrictions already reported by All About Durham. Daily, nightly and continuous entries do not describe the same kind of closure.
Clarington work Thursday and Saturday night
One alternating westbound Highway 401 lane between Highway 35/115 and Liberty Street in Clarington is listed for daily construction Thursday, November 19, from 9 a.m. to 3 p.m. Ontario 511 updated that entry November 18 at 2:47 p.m.
Between Harmony Road in Oshawa and Courtice Road in Courtice, two alternating eastbound Highway 401 lanes are listed for nightly construction from 8 p.m. Saturday, November 21, until 7 a.m. Sunday, November 22. That is a separate period from the previously reported November 19–21 window.
Whitby roadway and Ajax connection
Ontario 511 lists all westbound Highway 407 ETR lanes closed at Lake Ridge Road in Whitby for continuous maintenance from 10 p.m. Friday, November 20, until 6 a.m. Saturday, November 21. This entry describes a roadway closure, not simply a single-lane restriction.
On Highway 401 westbound between Highway 412 in Whitby and Salem Road in Ajax, one alternating lane is listed for nightly engineering investigation from November 23 at 11 p.m. through November 27 at 5 a.m.
Ritson Road and Port Perry work next week
At Ritson Road in Oshawa, separate engineering-investigation entries affect one alternating lane in each direction of Highway 401. The eastbound nightly period begins November 23 at 10 p.m. and ends November 27 at 6 a.m. The westbound period begins November 23 at 9 p.m. and ends November 27 at 5 a.m.
Ontario 511 describes each Ritson location as between Ritson Road and Ritson Road. These entries should not be expanded into an assumed full closure of the wider Ritson–Harmony section.
Highway 7A westbound between Nesbitt Line Road and Regional Road 57 South in Port Perry has one alternating lane listed for daily construction from November 23 at 6 a.m. through November 27 at 4 p.m.
The Durham highway restrictions are scheduled work windows, not a guarantee that every listed lane stays closed throughout each multi-day period. The reviewed entries do not supply a confirmed signed detour. Drivers should check the live provincial table before departure, allow for traffic controls and follow posted directions. Weather and operational conditions can change the schedule.


